Some equipment for the playground addition was delivered this past week. A utility scan located an electrical line and sewer easement under the blacktop to the left of the current playground, which was the designated site for the new addition. Additional scans were ordered and completed this past week for the grass area to the left of the current playground as well as on the blacktop to the right. Its is most likely that we will use the blacktop tp the right of the current playground for the playground addition. We expect resolution on the site this week.